Yikyui Photovoltaic Pile Drilling Rig can drive the pile into soil or rock to support the solar panel for solar power station system and guardrail installation, the common application is for Photovoltaic panels installation.
Solar Panels and Power Station Construction Processing
There are several type Photovoltaic rig, from manual rig, to semi-hydraulic pile driving machine to fully hydraulic drilling rig
Currently the full hydraulic piling driver is most popular rig in market
It can work with rotary head for auger drilling, also can work with Hammer to do hammering pile into soil directly
Yikyui PV piling machine includes 5~30M drilling depth models. It can be selected based on the pile shape and depth as per your project multiple requirements.
Photovoltaic Pile Driver Configuration
Solar drill rigs including following main parts:
Track – for tramming and ground support during drilling or piling
Fuel tank – storing fuel for engine
Hydraulic tank – storing hydraulic oil for hydraulic system
Engine – Commins or Yuchai eninge to supply power for rig
Cooler – including engine cooler and hydraulic oil cooler
Battery – to offer the electricity for electrical system
Cover – to protect the key component from rain, dust etc.
Boom – for hold the mast to different position
Slider – to adjust the off ground clearance for drilling
Drill mast – hold the rotary head or hammer head for drilling
Rotary head – can do auger drilling and DTH percussion drilling
Hammer head – hammer the pile into ground directly
Solar Pile Drilling Method– totally three different drilling procedure for PV drilling as following
-
Auger Drilling
- The pile driver drive the auger into soil directly by rotating, it is only for the soft ground such as soil, sand, soft clay.
- It needs to use rotary top head
-
DTH Drilling
- When drilling for hard formation like rock, hard clay. It impossible to break the rock by auger drilling or other type drilling to make pile into ground directly.
- Rig has to works with air compressor together for percussion drilling. In this way, it can make a borehole firstly, then put the pile inside or concreting a pile.
-
Hammering
- When it needs to install the solar pole in more efficienty way and have it stably installed, hammering the pile into ground directly is the best way.
- In this way, it needs to change to hammer head( pile driver), Hardrock Pile driver has very powerful impact power and high impact frenquenc
Solar Pile – for soft formation piling, it mainly use below 3 type pile
-
Auger Pile
- It is used with rotary head for sild drilling
- Common Pile Lengh: 1.5m / 2m / 3m
- Common Pile Diameter: 150mm ~350mm
- Stratum: Soft formation – soil, sand, clay
-
C Shape Pile
- It workds with hammer head to penetrate into groud directly
- Stratum: Soft formation – soil, sand, clay
-
H Shape Pile
- It workds with hammer head to penetrate into groud directly
- Stratum: Soft formation – soil, sand, clay
How solar panels can be used to provide electricity for domestic use.
For more information on this kind of PV piles drilling equipment as well as the auger rods,drilling tools and site configuration suggestion,please feel free getting back to us immediately !
